Home >> Cooper George Apartments

Cooper George Apartments EV Charging Project

Resound Energy completed a turnkey EV charging installation for Cooper George Apartments in Spokane, helping the property take advantage of state funding that covered 100% of the project costs. The result is a robust, scalable charging solution built to support tenants today while keeping future expansion straightforward.

Our team managed the full project in house, including utility coordination, electrical design, permitting, procurement, installation, and final commissioning. The completed system was delivered in alignment with Washington’s Electric Vehicle Charging Program (WAEVCP) requirements and was designed with power sharing technology and expansion provisions to support long term growth.

EV Project Highlights:

  • New service upgrade & integration with Avista Power
  • Feeder Circuit from upgraded utility XFMR to new EV panel
  • 200A CT Can with utility spec remote meter
  • New 200A 120/208V 3Phase EV Sub Panel
  • (13) Level 2 EV charging stations for apartment tenants
  • All chargers utilize power sharing to maximize future expansion of EV Charging

“Greystar has worked with Resound Energy on numerous EV charging installations across our portfolio. In 2024, we teamed up with COIL Inc. and Wallbox to install Level 2 charging stations at nearly 100 properties through Washington State’s EV charging grant.

 Resound Energy’s professionalism and quality of work went above and beyond our expectations, and we look forward to continuing this successful partnership.”

Gavin Shearer
Manager, Construction Services – Greystar

IMG XLt0oIiNGN 2025 09 260 26 51
IMG hWE3rD5DQX 2025 09 255 15 25
IMG Z5k7x4nzCu 2025 09 266 36 06
Our Steps For Project Success

Solution Design

We start every engagement with a free facility walk-through to generate a detailed cost-benefit analysis and proposal which includes product spec sheets.

Implementation

As a licensed general contractor, Resound Energy Services™ provides product demo’s to illustrate light quality and output in addition to our comprehensive installation services.

Utility Rebate Management

Our customers only pay net project cost after rebate. Utility rebate application services are provided by Resound Energy Services™ staff to ensure correct rebate funding.

Warranty Management

You will never have to change a light again for the term of the warranty. Product warranties ranging from 3 to 7 years are managed by Resound Energy Services™ staff.

Leave a Reply